'Protocol > TETRA' 카테고리의 다른 글
14.5.1 Individual CC procedures (0) | 2013.09.25 |
---|---|
14.5 Procedures (0) | 2013.09.25 |
14.4.1.1 CLOSED (0) | 2013.09.25 |
State transition diagram for the PC sub-entity (0) | 2013.09.25 |
14.3 Overview of services required by the CMCE (0) | 2013.09.25 |